Australian Spas and Pools has been trusted for nearly two decades to build pools of the highest standards. Pool construction is a step by step process and when the correct checks and processes are in place at each stage, it will be a simple and streamlined process no matter the size or complexity of the pool.

Whether you are in Minyama or Maleny, Mudjimba or Montville, or anywhere in between, we have the expertise and experience to design and build your dream pool.

A considered approach to pool construction

Great pools are not simply built. They are carefully designed, technically engineered and methodically constructed. Our advanced construction process considers every element of the project, from structural engineering and hydraulic performance through to finishes, landscaping and final commissioning.

Unlike many of our competitors, Australian Spas And Pools adapts with the ages, whether that be by supplying the latest advances in pool technology and filtration equipment, or adhering to the latest building recommendations and practices laid out by the QBCC and the Australian Building Building Codes Board, we want to ensure that your pool is built to the highest standards. 

1. Discover and Design


We assess the property, access, levels, orientation, existing structures, services and landscaping requirements before developing the project brief.

The pool is then designed around the home, outdoor areas and the way the space will be used, considering dimensions, depth, entry points, spa integration, water features and surrounding landscaping.

2. Engineer and Construct

    Before construction begins, we design the pool’s hydraulic circulation, pipework, filtration, sanitation, heating and equipment requirements to achieve efficient water movement, reliable performance and ease of maintenance.
    Structural engineering, soil conditions, retaining requirements and construction details are coordinated, along with the documentation required for approvals and certification.
    Building approvals, engineering requirements and project scheduling are finalised before site works commence. Access, excavation, material delivery and construction sequencing are planned in advance.

The pool is accurately set out and excavated before reinforcement,        plumbing and structural elements are installed. The concrete shell is then constructed in accordance with the engineered design.

    

3. Finishes and Quality Assurance

    Filtration, coping, tiling, interior finishes and architectural details are completed with intricate attention to alignment, levels and finish quality all while carefully coordinated with the landscape tiling, retaining walls, drainage, planting and surrounding elements to ensure the pool integrates naturally with the broader outdoor environment.
    Before handover, the pool is filled, equipment is commissioned, water chemistry is balanced and all systems are tested. We complete a final quality inspection before presenting the finished pool to the client with a detailed handover covering pool operation, filtration, sanitation and ongoing maintenance, together with continued support after completion